RIAI Keystone

Field photos in,
a maintenance plan out

Bridges, viaducts, tunnels, quay and retaining walls, facades. Photographs come back as findings tied to the element they sit on and scored against your condition standard, then roll up into a programme of work you can budget and defend.

RIAI Keystone analysis view for a concrete viaduct: a written summary of its condition, a chart of the most common defects, and findings grouped by element with the matching field photos.
From Finding To Plan

One photograph, then the whole programme

A finding arrives with its own evidence and the element it sits on. Enough of them, across enough assets and enough rounds, add up to a maintenance plan.

From a photograph to a report line

Open any finding and you get the wide shot, a close crop on the damage itself, the element it belongs to, and a written description of what was found. Reviewers correct or confirm, then move to the next one.

General + focused crop Element assignment Damage description PDF export
Report view: corrosion on a viaduct expansion joint, with the original photo, a focused crop, and the structured fields that become the report line.

Your whole portfolio on one map

Bridges, quay walls, turbine sites, pavement sections and facades sit on the same map, plotted where they actually stand and colour-coded by type. Filter to one class of asset, or work straight down the list of what needs attention first.

Mixed asset types Filter by class Ranked by condition
Asset portfolio view: a list of assets needing attention beside a map of 214 structures across the Netherlands, colour-coded by type.

Watch an asset change between rounds

Because every round is scored against the same defect list, rounds are directly comparable. The condition index, the split by severity, and a line-by-line diff of what is new, what got worse, and what a repair actually fixed.

Condition index Severity mix per round New / worsened / resolved
Condition history: a condition index trending across five inspection rounds, findings per round split by severity, and a table of what changed since the previous round.

Then the plan the findings add up to

Confirmed findings become interventions: ranked by safety impact and by how fast the defect is progressing, costed, and spread across the years your budget actually covers. Deferring something is a decision you make with the consequence in front of you rather than a gap in a spreadsheet.

Prioritised backlog Multi-year spend forecast Cost by intervention type Export
Planning view: forecast maintenance spend by year, spend broken down by intervention type, and a prioritised backlog of interventions with cost estimates.

See RIAI Keystone on your own assets

Tell us what you inspect. We'll follow up to scope a pilot.

Request a Demo